Learn about the ongoing 公共工程 and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
South Gulf Cove FY24 Bridge Rehabilitations - #014065, #014070, #014072
Last Updated: 05/01/2024 Category: 桥梁 当前阶段: Design Development
South Gulf Cove FY24 Bridge Rehabilitations - 桥梁 #014065, #014070, #014072路 and Bridge FY24 Bridge Rehabilitations Bermont 路 - #010003, #010016, #010017, #010020
Last Updated: 05/01/2024 Category: 桥梁 当前阶段: Design Development
路 and Bridge FY24 Bridge Rehabilitations Bermont 路 - #010003, #010016, #010017, #010020Mid-County Library Hurricane Repairs
Last Updated: 05/01/2024 Category: County Facilities 当前阶段: Planning and Project Approval
Utilizing the Hurricane repair consultant contract as well as the construction manager at risk for Mid-County repairs contract, design and restore the Mid-County Library to its condition prior to the event. Utilize the opportunity to make improvements to the facility where applicable following the guidelines of the County's insurance policy.Manasota Key Sidewalk, Lighting & 景观
Last Updated: 04/29/2024 Category: 人行道上 Category: 景观 类别:其它 当前阶段: Design Development
Gulf Boulevard Sidewalk, Lighting & 景观Various Intersection Improvements
Last Updated: 04/29/2024 Category: 巷道 当前阶段: Design Development
The design and construction of new turn lanes and traffic signal modifications at various intersections around Port Charlotte, including Murdock Circle, Cochran Boulevard, Peachland Boulevard, and Veterans Boulevard.
Last Updated: 04/29/2024 Category: 人行道上 当前阶段: Planning and Project Approval
Gasparilla Pines Boulevard PathwayCharlotte Harbor CRA - Melbourne Street multi-use path
Last Updated: 04/29/2024 Category: 人行道上 当前阶段: Design Development
Construct multi-use path on Melbourne Street from U.S. 41 to Harborview 路.
Last Updated: 04/29/2024 Category: 巷道 当前阶段: Design Development
Widen Kings Highway to a 4 lane divided roadwayCharlotte Harbor CRA - Parmely Street road widening and sidewalk
Last Updated: 04/29/2024 Category: 巷道 当前阶段: Design Development
Reconstruct and widen Parmely Street from U.S. 41 to Bayshore 路.
Construct multi-use path on Parmely Street from U.S. 41 to Bayshore 路.